how much time it will take for whole kitchen remodel also i cook almost every day so durability matters for me
-
Lead Time
Lead time for City Cabinets is approximately 6 weeks, with an additional 1 to 2 weeks if you select painted or stained finishes. Once transit and delivery are factored in, you can expect an overall timeline of 8 to 10 weeks from the date you place your order to delivery at your project site.
Installation scheduling, countertop coordination, and all on site work are the responsibility of the customer and their contractors. Please note that all lead times are estimates and may ship sooner or later depending on production volume and material availability.
Durability and ConstructionDurability is the foundation of the City Cabinets line. All cabinets are built from 3/4 inch thick plywood, making them extremely rigid and long lasting.
When we designed the City line, we sourced one of the densest plywood cores available, finished with a baked on UV clear coat over birch veneers. Combined with the full 3/4 inch construction, this creates a cabinet designed to last for generations.
All doors are custom made in Oregon from your selected wood species. Our painted and stained finishes use premium Sherwin Williams coating systems, offering industry leading durability from one of the most reputable coatings manufacturers in the world.
All City Cabinets come standard with Blum hardware, including Blumotion soft close drawer slides and hinges. With no weak points in construction, City Cabinets were engineered from the ground up for long term performance when the line launched in 2023.
In short, City Cabinets delivers the best strength, finish quality, and hardware in its class, making it the best value for the money.
-
-